Our Recent Past Projects

List of Completed Works

Completed Works Last 5 Years
SL. No. Work Description Awarding Authority  Value of Work. Tk. In million Completed Financial Year Status
1 Name of Work: “Construction of Khulna Coal Based Power Plant Connecting Road from Khulna-Mongla Highway at Babubari in Rampal UPazila under Bagerhat District”, Contract Package No. Bager/Rampal/01 Toma Construction and Company Ltd.                              77/1, Kakrail, Ramna,                   Dhaka-1000           972.61 12.02.17 Successfully completed the works.
2 Construction for Executive Complex, Satarkul, Badda work for Pre cast Pile Driving United Property Solutions Limited
Gulshan Centre Point
Plot # 23-26, Road # 90-91,
Gulshan -2, Dhaka-1212
Bangladesh
             9.74 30-06-17 Successfully completed the works.
3 Conversion of MG track into Dual gauge from km 379.00 to kim 419.00 in Parbatipur-Kanchan-Birol Station and MG track into Broad Gauge from Km 419.00 to 428.00 in Birol station-Birol Border including construction of DG standard minor bridge rehabilitation of station building Platform lxing gate, embankment & other structural including supply of requested Materials. equipment & machineries including Labor and transportation cost etc, and internal electrification work (on Turn Key Basis) for the Project of Bangladesh Railway, under Ministry of Railway. Package No. DW-01,  including 1000 & 1200 mm dia Cast-in-situ Pile. diriving method Hydraulic Rotary Rig Toma Construction and Company Ltd.                              77/1, Kakrail, Ramna,                             Dhaka-1000         705.030 2016-2017 Successfully completed the works.
4 Construction of 03 nos. major bridge (Bridge No. 30/M, 42/DR, 45/DR) including supply and installation of girder temporary arrangement and other ancilary works for the Project of Bangladesh Railway, under Ministry of Railway. Package No. DW-05, including 750, 1000 & 1200 mm dia Cast-in-situ Pile. diriving method Hydraulic Rotary Rig Toma Construction and Company Ltd.                              77/1, Kakrail, Ramna,                             Dhaka-1000         651.035 2016-2017 Successfully completed the works.
5 Work Name: Construction of concrete grain Silo Jetty civil work, sub and super structure for 175 meter x 20.50 meter Unloading Jetty, 50 meter x 1060 meter Loading Jetty, 27 meter x 10.60 meter Steel bridge and 125 meter x 13.90 Meter access bridge of Mongla Silo Jetty. including 600, 750, 1000, 1200, & 1500 mm dia Cast-in-situ pile. (Boring By Hydraulic Rotary Method) Toma Construction and Company Ltd.                              77/1, Kakrail, Ramna,                              Dhaka-1000           994.70 30-Jun-17 Successfully completed the works.
6 Conversion of MG track into Dual gauge from km 413.00 to kim 462.00 in – Kanchan – Panchagarh including construction of DG  standard minor bridge rehabilitation of station building Platform lxing gate, embankment & other structural including supply of requested Materials. equipment & machineries including Labor and transportation cost etc, and internal electrification work (on Turn Key Basis) for the Project of Bangladesh Railway, under Ministry of Railway. Package No. DW-02,  including 1000 & 1200 mm dia Cast-in-situ Pile. diriving method Hydraulic Rotary Rig Toma Construction and Company Ltd.                              77/1, Kakrail, Ramna,                             Dhaka-1000           608.06 2016-2017 Successfully completed the works.
7 Work Name: Construction of  Pabna-Dhalarchar Major Bridge Project. Work order for 1000mm dia cast-in-situ pile at Br. No. -8 and Br. No.- 105 (Boring By Hydraulic Rotary Method) Toma Construction and Company Ltd.                              77/1, Kakrail, Ramna,                           Dhaka-1000           54.700 31.03.18 Successfully completed the works.
8 Construction of Flyover Bridge in Dhaka (Construction of  Mogbazar-Mouchak (Combined) Flyover ) Project (Integrated Flyover.)  including 1000, 1200,1500 &1800 mm dia Cast-in-situ Pile.dia Total pile 130, 345, 109 & 36nos. Cast-in-situ Pile. diriving method Hydraulic Rotary Rig Toma Construction and Company Ltd.                              77/1, Kakrail, Ramna,                             Dhaka-1000         356.125 26-07-18 Successfully completed the works.
9 Dhaka-Khulna N-8 Project, Mawa, Work for  1200 Meter dia Cast in situ Pile  Boring By Hydraulic Rotary Method. (Md. Alam)
Managing Director,
Rana Builders (Pvt.) Ltd. 55, West Panthapath, Sheltech Tower, 7th Floor, Dhaka -1205
           83.52 31-03-18 Successfully completed the works.
10 Construction of 300 feet, Purbachal City, Dhaka work Cast in situ pile driving( Purbachal Lake Army Project) Zakir Enterprise,                                      Road-28, House-385, Mohakhali DOHS, Dhaka            19.99 27-07-18 Successfully completed the works.
11 Work for 350 mm x 350 mm pre-cast pile casting & driving works (Service Pile) of Project “NHA-DHK-Mirpur Sopno-Nagar Phase-2 Bldg. No. 24 & 25 at Kalshee, Mipur-9, Dhaka. Comprehensive Holdings ltd.                   House # 03, Road # 16, (New) 27 (old), Dhanmondi R/A, Dhaka-1209            21.50 31-12-18 Successfully completed the works.
12 20″ Dia Piling Work/Job For Construction Of Jetty Extension & Other Related Works At United Land Port Teknaf Limited At Teknaf, Chittagong[Oxygen & LP Gas Will Be Provided By (Legal Piling & Construction (LPC)] Pile Length: 40 Feet To 80 Feet Maximum Number Of Piles: 8 (Eight). United Land Port Teknaf Limited,
Head Office, Gulshan Centre Point
House # 23-26, Road # 90-91, Gulshan -2, Dhaka-1212
Bangladesh.
           14.00 28-11-18 Successfully completed the works.
13 BGME Bhaban, Uttara, Dhaka, work for Cast-in-situ pile driving and casting. Managing Director, Prokowsoli Nirman Ltd. House No.-401 (2nd floor) Road No. 29, New DOHS, Mohakhali, Dhaka-1206.            19.70 15-12-18 Successfully completed the works.
14 Construction of United Maymensingh Power Ltd. Work for Pre cast pile casting and driving United Group, Gulshan Center Point, Gulshan Circle-02, Dhaka-1212.            14.01 31-12-18 Successfully completed the works.
15 1000 mm dia Cast-in -situ  Jetty pile at Sondip (goptochara ghat, Chittagong S.S. Rahman International,                 Hossain Tower (Level-10),                     116, Box culver Road, Naya Paltan,                   Dhaka-100            59.60 2017-2018 Successfully completed the works.
16 Casting & Driving Of Piles (16″X16″), Pile Length 60 Feet (No. Of Piles 250) At Project: United Asset-1, United City, Satarkul, Badda, Dhaka-1212. United Property Solutions Limited
Gulshan Centre Point
Plot # 23-26, Road # 90-91,
Gulshan -2, Dhaka-1212
Bangladesh
             4.30 15-01-19 Successfully completed the works.
17 Works for Pre-cast pile Driving  of Labukhali Cantt. Barisal. The Director
Shepherd Consultant And Management Ltd.
House # 441, Road # 07,
DOHS Baridhara.
             6.95 01-02-19 Successfully completed the works.
18 900 mm Cast in Situ Pile & Construction of Steel Silo Project at Ashugong, Boirob Toma Construction and Company Ltd.                              77/1, Kakrail, Ramna,                                 Dhaka-1000            55.00 30.04.19 Successfully completed the works.
19 Construction of 4-Lane Khulna Coal Based Power Plant Connecting Road +2-slow moving lane +2-bus bay with Underpass Road, Under Rampal Upazila, Bagerhat District”, Package No. Bager/Rampal/01 Toma Construction and Company Ltd.                              77/1, Kakrail, Ramna,                             Dhaka-1000        1,170.89 30-05-19 Successfully completed the works.
20 United Property Solutions Ltd, Various Pre-cast pile driving Project, Total pile 5154 nos size 16″x 16″ & 18″x 18″ United Property Solutions Limited
Gulshan Centre Point
Plot # 23-26, Road # 90-91,
Gulshan -2, Dhaka-1212
Bangladesh
           52.87 2018-2020 Successfully completed the works.
21 Work /Job For Pile 600 mm Dia & 1000 mm Dia Boring By Hydraulic Rotary Method Works For Cast in Situ Piles & Construction work of  Dolphin Jetty at Mongla United Refinery & Bulk Storage ltd.
Gulshan Centre Point
Plot # 23-26, Road # 90-91,
Gulshan -2, Dhaka-1212
Bangladesh
           60.34 2018-2019 work have extended Successfully completed the works.
22 Construction of 750m Long PSC girder Bridge over Jdulata River on Dharmapasha Madha Nagar – Mheshkhola – Takerhat – Lawerghor – Sunamganj Road at Ch: 20+850 Km. Work for Pile boring by Rotary Drilling Machine, Re-bar Binding & Pile Concreting Works. Toma Construction and Company Ltd.                              77/1, Kakrail, Ramna,                         Dhaka-1000            25.00 2018-2019 work have extended Successfully completed the works.
23 Works for 1000 mm dia Pre-cast pile Driving   Construction of 450 m long PSC Girder Bridge over Atrai river on Suzalpur UP office Birgonj upazila HQ to Pakerhat GC khanshama upazila via Burirbazar road jointia ghat at Ch 7350 under Birganj upazila District Dinajpur Road ID No 127122007. Proprietor, M/s  Surma Enterprise, Address: Teekna Apartment, 6 green Corner, A-2, Green road, Dhaka-1205            17.00 2019-2020 Successfully completed the works.
24 1500 mm dia, Cast-in- situ  Test Pile  Boring & Casting.  Boring by                Hydraulic Rig Machine and Static load test, 2500 Ton 3nos.  2000 Ton 3nos.,  1500 Ton 3nos. At United City Meghbon Resdential Development Project, Dhaka, Bangladesh. Managing Director,
United Property Solutions Ltd.
Gulshan Centre Point
Plot # 23-26, Road # 90-91,
Gulshan -2, Dhaka-1212
Bangladesh
           18.00 2019-2020 Successfully completed the works.
25  Boring & Casting, Situ pile 1000mm dia pile at Nabinagar- Ashugonj Road, under Brahmanbaria Road Division, Brahmanbaria.
Project  Name:558.209 m (12 x 45.732 m)long P.C. Girder Bridge (Titas Bridge) at 3rd Km. (Ch: 2km + 775.00 m)
Managing Director,
Rana Builders (Pvt.) Ltd.
55, West panthapath, Sheltech Tower
Dhaka-1205
           37.50 2019-2020 Successfully completed the works.
26 Cast-in-situ Shore pile 500mm dia  pile at Dhanmondi, Road No. 8A, House No.-50 Managing Director,
Rana Builders (Pvt.) Ltd.
55, West panthapath,
Sheltech Tower
Dhaka-1205
             8.00 2019-2020 Successfully completed the works.
27  Work  for 18˝ x 18˝ dia Pre-cast pile  Driving at Rampal Coal Base Power Plant. And Savar, Nikunjo, Dhaka Uddan The Managing  Director,  N S Construction Limited. EPIC Ittefaq Point (3rd Floor), 618 Nur Ahmed Sarak (Jubilee Road), Chittagong, Bangladesh            45.00 2019-2020 Successfully completed the works.
28 Driving & Casting of 600 mm dia Cast-in-situ Pile with permanent steel pipe casing for the work – Construction of Steel Silo (Jetty Portion) at Ashugonj, Brahmanbaria. Toma Construction and Company Ltd.                              77/1, Kakrail, Ramna,                         Dhaka-1000            32.21 2019-2020 Successfully completed the works.
29 1200 mm Dia cast in situ pile & Load Test,  Project: Dohazari – Cox’sBazar Railway Project, Lot-01 Toma Construction and Company Ltd.                              77/1, Kakrail, Ramna,                         Dhaka-1000            34.70 2019-2020 Successfully completed the works.
30 900mm dia & 1200mm Cast-in-Situ pile Boring & Casting Rod binding welding etc.
Project Location:  Wasa Bhaban, Chittagong.
The Managing Director,
M. Jamal and Company Limited.
House # 20/01, Road # 15 (New)
Dhanmondi Residential Area,
Dhaka-1205.
           44.00 2019-2020 Successfully completed the works.
31 Pre-cast pile driving (16”x16”), pile length 60 feet at
Project: United intl. Madical college  at united city, satarkul, badda, dhaka-1212
The Managing Director
United International Madical College
Gulshan Centre Point
Plot # 23-26, Road # 90-91,
Gulshan -2, Dhaka-1212
Bangladesh
           11.24 2020-21 Successfully completed the works.
32  1000mm,1200mm  dia, Boring & Casting, Situ pile  at Nayerhat bridge and Nilphamary 4 Nos Bridge, Netrokona & Kurigram Bridge under RHD Managing Director,
Rana Builders (Pvt.) Ltd.
55, West panthapath, Sheltech Tower
Dhaka-1205
           52.50 2020-21 Successfully completed the works.
33 300 feet Purbachal Bridge Project, Cast-in-situ 1200 mm dia pile Boring casting & Rod binding.  Boring method Hydraulic Rotary Rig.and Load Test and Etc project Managing Director,
BBL-BTC-MIB JV &
Biswas Builders Limited.
New Market, Dhaka
          41.815 2020-21 Successfully completed the works.
34 Pre-cast pile driving & Casting (12”x12”),   At
Project Location:  Chittagong of BBL-BTC-MLB JV Project
BBL-BTC-MLB JV
New Market City Complex, 44/1 Rahim Square.
New Market, Dhaka
          15.000 2020-21 Successfully completed the works.
35 280 m long pc Girder bridge over Boral River on Ershadnagar Hat- Demra up Office  Road underFaridpur Upazil.
Boring & Casting 1000mm  dia  cast-in-situ piles and Rod binding including cutting, bending, G.I wire, Welding Etc. Including Bentonite
(Working Method: Hydraulic Rotary Rig
Md. Labu Miah, Proprietor L.R. Construction
House # 37, Road # 06. Block # E, Banasree,
Rampura, Dhaka-1219

Department: RHD

                 55.00 2020-21 Successfully completed the works.
36 300 feet Purbachal Bridge Project, Cast-in-situ 1200 mm dia pile Boring casting & Rod binding.  Boring method Hydraulic Rotary Rig.and Load Test Managing Director,
Biswas Builders Limited.
New Market, Dhaka
           39.67 2020-21 Successfully completed the works.
    Total Value of works =    6,411.28 Million Tk